KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  9-27-2008
Number of Hours:  6.25
Manual Reference:  10-5
Brief Description:  Landing gear fairing preparation

Today I sanded the intersection fairing to main wheel fairing interface and then microballooned the interface to get a smooth flowing transition between the two. Next I mounted them on the gear leg, drilled all the various holes to final size followed by riveting on of the nut plates. I also worked on the nose wheel fairing; bonding on a filler strip on the top leading edge of the aft fairing section.
' style=

Fairing interface microballooned and sanded

Fairing interface microballooned and sanded

' style=

Wheel fairing anchor nuts riveted in

Wheel fairing anchor nuts riveted in

' style=

Nose wheel fairing top leading edge filler strip added

Nose wheel fairing top leading edge filler strip added

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.